Optimizing Production Planning Under Uncertainty: A Fuzzy Goal Programming Approach with Adaptive Metaheuristic Algorithms for Improved Decision-Making
DOI:
https://doi.org/10.35335/emod.v14i2.30Keywords:
Uncertainty, Production planning, Fuzzy goal programming, Stochastic optimization techniques, Decision-makingAbstract
This research addresses the challenge of uncertainty in production planning by proposing a novel approach that combines fuzzy goal programming with stochastic optimization techniques. The integration of these two methodologies provides decision-makers with a comprehensive framework to make improved and robust decisions in the face of uncertainty. Fuzzy goal programming allows decision-makers to express imprecise objectives and constraints, accommodating the inherent vagueness and trade-offs in production planning. Stochastic optimization techniques consider multiple scenarios and their associated probabilities, enabling the optimization of production plans that are robust and near-optimal across different uncertain situations. The proposed approach offers flexibility in decision-making, as decision-makers can express their preferences and goals in a subjective manner while considering uncertainty. The research contributes to the field by providing a systematic framework to manage uncertainty in production planning and improve overall performance in manufacturing organizations. The practical implications of the research are significant, as decision-makers can make informed decisions regarding resource allocation, customer demand fulfillment, and cost optimization. The research findings highlight the effectiveness of the proposed approach and its potential for application in various industry contexts. However, limitations in computational complexity and the need for further refinements are acknowledged. Future research can focus on refining the approach, addressing specific industry challenges, and extending its applicability in real-world production planning problems.
References
Aka, S., & Akyüz, G. (2018). Fuzzy goal programming approach on location-routing model for waste containers. International Journal of Industrial and Systems Engineering, 29(4), 413-427.
Caballero, R., Gómez, T., & Ruiz, F. (2009). Goal programming: realistic targets for the near future. Journal of Multi‐Criteria Decision Analysis, 16(3‐4), 79-110.
Cavdur, F., Sebatlı, A., & Küçük, M. K. (2019). A group-decision making and goal programming-based solution approach for the student-project team formation problem. Journal of the Faculty of Engineering and Architecture of Gazi University, 34(1), 505-521.
Çetin, E., & Sarucan, A. (2015, May). Nurse scheduling using binary fuzzy goal programming. In 2015 6th International Conference on Modeling, Simulation, and Applied Optimization (ICMSAO) (pp. 1-6). IEEE.
Cheraghalikhani, A., Khoshalhan, F., & Mokhtari, H. (2019). Aggregate production planning: A literature review and future research directions. International Journal of Industrial Engineering Computations, 10(2), 309-330.
Díaz-Madroñero, M., Mula, J., & Jiménez, M. (2014). Fuzzy goal programming for material requirements planning under uncertainty and integrity conditions. International Journal of production research, 52(23), 6971-6988.
Díaz-Madroñero, M., Pérez-Sánchez, M., Satorre-Aznar, J. R., Mula, J., & López-Jiménez, P. A. (2018). Analysis of a wastewater treatment plant using fuzzy goal programming as a management tool: A case study. Journal of Cleaner Production, 180, 20-33.
El-Wahed, W. F. A. (2008). Intelligent fuzzy multi-criteria decision making: review and analysis. Fuzzy multi-criteria decision making: theory and applications with recent developments, 19-50.
Ervural, B. C., Evren, R., & Delen, D. (2018). A multi-objective decision-making approach for sustainable energy investment planning. Renewable energy, 126, 387-402.
González-Pachón, J., & Romero, C. (2010). Goal programming: From constrained regression to bounded rationality theories. In Handbook of multicriteria analysis (pp. 311-328). Berlin, Heidelberg: Springer Berlin Heidelberg.
Hajiagha, S. H. R., Akrami, H., Hashemi, S. S., & Mahdiraji, H. A. (2015). An integer grey goal programming for project time, cost and quality trade-off. Engineering Economics, 26(1), 93-100.
Ighravwe, D. E., & Oke, S. A. (2015). A combined fuzzy goal programming and Big-Bang Big-Crunch algorithm for workforce optimisation with facility layout consideration. Engineering Journal, 19(2), 71-98.
Ighravwe, D. E., Oke, S. A., & Adebiyi, K. A. (2018). An enhanced reliability-oriented workforce planning model for process industry using combined fuzzy goal programming and differential evolution approach. Journal of Industrial Engineering International, 14, 185-212.
Jolai, F., Razmi, J., & Rostami, N. (2011). A fuzzy goal programming and meta heuristic algorithms for solving integrated production: distribution planning problem. Central European Journal of Operations Research, 19, 547-569.
Juan, A. A., Faulin, J., Grasman, S. E., Rabe, M., & Figueira, G. (2015). A review of simheuristics: Extending metaheuristics to deal with stochastic combinatorial optimization problems. Operations Research Perspectives, 2, 62-72.
Khan, S. A., & Mahmood, A. (2019). Fuzzy goal programming-based ant colony optimization algorithm for multi-objective topology design of distributed local area networks. Neural Computing and Applications, 31, 2329-2347.
Kharrat, A., Chabchoub, H., & Aouni, B. (2010). Decision-maker's preferences modelling within the interactive imprecise goal programming model. International Journal of Innovative Computing and Applications, 2(3), 150-169.
Kharrat, A., Dhouib, S., Chabchoub, H., & Aouni, B. (2011). Decision-maker’s preferences modelling in the engineering design through the interactive goal-programming. International Journal of Data Analysis Techniques and Strategies, 3(1), 85-104.
Liang, T. F. (2009). Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach. Computers & Industrial Engineering, 57(4), 1407-1416.
Liang, T. F. (2010). Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments. Expert Systems with Applications, 37(12), 8499-8507.
Lu, J., Han, J., Hu, Y., & Zhang, G. (2016). Multilevel decision-making: A survey. Information Sciences, 346, 463-487.
Mehdizadeh, E., Niaki, S. T. A., & Hemati, M. (2018). A bi-objective aggregate production planning problem with learning effect and machine deterioration: Modeling and solution. Computers & operations research, 91, 21-36.
Mousavi, S. M., & Vahdani, B. (2017). A robust approach to multiple vehicle location-routing problems with time windows for optimization of cross-docking under uncertainty. Journal of Intelligent & Fuzzy Systems, 32(1), 49-62.
Nahhas, A., Lang, S., Bosse, S., & Turowski, K. (2018, October). Toward adaptive manufacturing: Scheduling problems in the context of industry 4.0. In 2018 Sixth international conference on enterprise systems (ES) (pp. 108-115). IEEE.
Nikghadam, S., Sadigh, B. L., Ozbayoglu, A. M., Unver, H. O., & Kilic, S. E. (2016). A survey of partner selection methodologies for virtual enterprises and development of a goal programming–based approach. The International Journal of Advanced Manufacturing Technology, 85, 1713-1734.
Özder, E. H., Özcan, E., & Eren, T. (2019). Staff task-based shift scheduling solution with an ANP and goal programming method in a natural gas combined cycle power plant. Mathematics, 7(2), 192.
Pasandideh, S. H. R., Niaki, S. T. A., & Asadi, K. (2015). Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA. Information Sciences, 292, 57-74.
Rahmani, D., Ramezanian, R., & Saidi-Mehrabad, M. (2014). Multi-objective flow shop scheduling problem with stochastic parameters: fuzzy goal programming approach. International Journal of Operational Research, 21(3), 322-340.
Ransikarbum, K., & Mason, S. J. (2016). Goal programming-based post-disaster decision making for integrated relief distribution and early-stage network restoration. International Journal of Production Economics, 182, 324-341.
Sadeghieh, A., Dehghanbaghi, M., Dabbaghi, A., & Barak, S. (2012). A genetic algorithm based grey goal programming (G3) approach for parts supplier evaluation and selection. International Journal of Production Research, 50(16), 4612-4630.
Tao, Y., Meng, K., Lou, P., Peng, X., & Qian, X. (2019). Joint decision-making on automated disassembly system scheme selection and recovery route assignment using multi-objective meta-heuristic algorithm. International Journal of Production Research, 57(1), 124-142.
Tilahun, S. L. (2019). Feasibility reduction approach for hierarchical decision making with multiple objectives. Operations Research Perspectives, 6, 100093.
Toklu, B., & Oezcan, U. Ğ. U. R. (2008). A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives. Engineering Optimization, 40(3), 191-204.
Vasant, P. (2013). Hybrid mesh adaptive direct search genetic algorithms and line search approaches for fuzzy optimization problems in production planning. Handbook of Optimization: From Classical to Modern Approach, 779-799.
Wari, E., & Zhu, W. (2016). A survey on metaheuristics for optimization in food manufacturing industry. Applied Soft Computing, 46, 328-343.
Wichapa, N., & Khokhajaikiat, P. (2017). Solving multi-objective facility location problem using the fuzzy analytical hierarchy process and goal programming: a case study on infectious waste disposal centers. Operations Research Perspectives, 4, 39-48.
Wichapa, N., & Khokhajaikiat, P. (2017). Using the hybrid fuzzy goal programming model and hybrid genetic algorithm to solve a multi-objective location routing problem for infectious waste disposal. Journal of Industrial Engineering and Management, 10(5), 853-886.
Wichapa, N., & Khokhajaikiat, P. (2018). Solving a multi-objective location routing problem for infectious waste disposal using hybrid goal programming and hybrid genetic algorithm. International Journal of Industrial Engineering Computations, 9(1), 75-98.
Yang, T., & Chou, P. (2005). Solving a multiresponse simulation-optimization problem with discrete variables using a multiple-attribute decision-making method. Mathematics and Computers in simulation, 68(1), 9-21.
Yin, Y., Li, Z. C., Lam, W. H., & Choi, K. (2014). Sustainable toll pricing and capacity investment in a congested road network: a goal programming approach. Journal of Transportation Engineering, 140(12), 04014062.
Yousefi, H., Tavakkoli-Moghaddam, R., Oliaei, M., Mohammadi, M., & Mozaffari, A. (2017). Solving a bi-objective vehicle routing problem under uncertainty by a revised multi-choice goal programming approach. International Journal of Industrial Engineering Computations, 8(3), 283-302.
Zaidan, A. A., Atiya, B., Abu Bakar, M. R., & Zaidan, B. B. (2019). A new hybrid algorithm of simulated annealing and simplex downhill for solving multiple-objective aggregate production planning on fuzzy environment. Neural computing and applications, 31, 1823-1834.
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 Managua Jaramillo Luther, Escritura Perezalonso Según

This work is licensed under a Creative Commons Attribution 4.0 International License.